Infrastructure & Logistics · 2023

Gashuunsukhait AGV Terminal

Integrated electrical, fiber, CCTV and control-system infrastructure for a 66-hectare automated container terminal.

Client

Smart Eco Trans LLC

Year

2023

Location

Gashuunsukhait

Sector

Infrastructure & Logistics

Gashuunsukhait AGV Terminal

Project at a glance

66 ha

Project area

21,000 m

Fiber optic cable

210

CCTV cameras

6,300 m

Excavation

150

Concrete manholes

Overview

Gashuunsukhait AGV Terminal

Argai Energy’s documented scope included underground route infrastructure, electrical cabling, fiber connectivity, AGV supporting equipment, CCTV and the Genetec-based integrated control-center system.

Argai scope

Documented Project Scope

Underground route and manhole infrastructure01
Electrical cabling02
Fiber network and core termination03
AGV antenna and magnetic-marker infrastructure04
CCTV and Genetec integrated management05
Control-center video-wall system06

Technical highlights

Documented Delivery Quantities

4,600 m

Ø100 steel conduit

8,000 m

Ø160 PVC conduit

1,900

Fiber-core connections

3,000 m

Electrical cable

1,596

AGV magnetic markers

24 × 55 in

Control-center video-wall displays

Project gallery

Field Delivery & Systems

Gashuunsukhait AGV Terminal

Related capabilities

Explore Engineering Services

Start a project

Planning an Engineering Project?

Discuss project requirements with the Argai Energy engineering team.

Request a quotation